In 1916, a predecessor of National Fuel Gas Company developed an underground gas storage reservoir at Zoar Field, south of Buffalo. The useful invention was a way of separating two moments: when gas could be supplied and when somebody needed to burn it. Summer could help pay for winter. A geological formation became a scheduling device.
That small piece of industrial history explains a great deal about National Fuel. Its expertise lives between the obvious things. Finding gas matters. So does having somewhere to put it, a route to move it, and a customer waiting at the other end. The company has spent generations assembling those connections. In October 2026, it decided to redraw the ownership lines.
- Gas production, transport and delivery under one roof.
- A $2.62 billion Ohio utility purchase closed in October 2026.
- A proposed 2027 split would redraw that roof.
02The businesses hiding inside a gas bill
National Fuel operates three reporting segments: Integrated Upstream and Gathering, Pipeline and Storage, and Utility. Seneca Resources produces Appalachian natural gas, including from the Marcellus and Utica shales. The gathering business collects production close to the wells. Interstate pipelines carry gas between markets; storage provides flexibility over time. Local distribution systems complete the trip to homes and businesses.
The customers change along that route. A household wants heat, hot water and a manageable bill. A commercial kitchen needs dependable fuel. Utilities, power generators and industrial users need transportation and access to supply. Producers need an outlet for their gas. National Fuel sells different answers to each problem, rather than a single undifferentiated energy product.
The money changes character, too. Production is exposed to commodity prices, with hedging used to manage part of that exposure. Pipeline and storage services depend on contracts and regulated tariffs. Utility earnings depend on regulated delivery service and approved investment recovery. Owning all three combines businesses whose cash flows respond to different pressures.
Wells + gatheringNational Fuel would retain
Regulated infrastructure
03Buy the connection, then build around it
The company was incorporated in 1902, bringing together natural gas interests associated with Standard Oil’s Natural Gas Trust. Its later history reads like a map being filled in: Empire Pipeline in 2002; Seneca’s first operated Marcellus well in 2009; a gathering company formed that same year. Drilling and the means of moving production developed together.
In 2020, National Fuel bought Shell’s Pennsylvania upstream and gathering assets for approximately $504 million in cash after purchase-price adjustments. The original announced consideration had been $541 million. The assets fit alongside an existing Appalachian business, giving National Fuel more than acreage alone.
This is the competitive argument for integration. A producer dependent on somebody else’s gathering system has an additional commercial relationship to negotiate and coordinate. Owning that connection gives a company more control over development schedules and infrastructure spending. It still needs buyers, usable transportation capacity and economic wells. A connected map can improve execution; it cannot manufacture a favorable gas price.

04The pipeline its own customer declined
Northern Access was supposed to create another route to market. By June 2024, the proposed project involved roughly 99 miles of pipeline and carried a preliminary $500 million estimate under review. About $55 million had already been spent at that point.
The first obstruction was authorization: years of litigation held up development. A favorable court decision in 2024 allowed the company to revisit the project. That review exposed a second problem. Higher expected capital costs required higher transportation rates. Seneca, the sole shipper and a fellow National Fuel subsidiary, would not accept them.
The shipping agreements were terminated in October 2024. National Fuel abandoned construction and recorded a $46.1 million pretax impairment for fiscal 2024. Winning a legal argument had not restored the original economics. The episode offers a practical management lesson: give an internal customer permission to reject an investment, even after years of effort have made withdrawal uncomfortable.
Pretax impairment after the planned pipeline was abandoned. An accounting write-down, not the project’s construction budget.
05Ohio changes the arithmetic
On October 1, 2026, National Fuel completed its acquisition of CenterPoint Energy’s Ohio gas utility. The agreed purchase price was $2.62 billion, subject to customary adjustments. The acquired operation serves approximately 335,000 customers in 16 counties around Dayton and the greater Miami Valley. The transaction brought National Fuel’s total utility customer base to about 1.1 million and doubled its utility rate base.
That scale helps explain the next announcement. On October 14, the board approved a plan to spin off Integrated Upstream and Gathering. The target is the second half of 2027, subject to financing, securities filings and final board approval. National Fuel would retain its regulated utilities, interstate pipelines and storage. Wells and gathering would remain together in the separate business.
Bauer’s explanation began with the Ohio closing: each business had become large enough to pursue its opportunities independently. The proposed boundary preserves connections management considers useful while giving the two companies different capital-allocation frameworks. It is a judgment about where integration earns its keep. The split has been announced; its promised benefits remain to be demonstrated.
“Our integrated business model has provided us significant benefits for many years”David P. Bauer / October 14, 2026
06The part worth borrowing
For customers, the immediate value remains practical. People in the utility territories can arrange gas service and manage bills through the company’s customer tools. Businesses can obtain transportation support. The Ohio closing announcement said service would continue without interruption and required no customer action. A corporate transaction can be consequential without requiring a household to do anything.
For operators elsewhere, the useful idea is to examine the handoffs in a business. Own a connection when coordination, access or scheduling justifies the capital. Reprice it when conditions change. That approach needs enough demand and regulatory permission to support the assets. It becomes expensive when construction costs rise, approvals drag on or customers cannot support the required rates.
There is also work that survives every organizational chart: maintaining pipes, finding leaks and training people. National Fuel’s stated values include safety, integrity, excellence and commitment. Its September 2026 responsibility update reported mentorship programs and continued methane-intensity reductions. Those are operational commitments to measure over time, alongside the financial ones.
An underground reservoir made gas available at a different time. A pipeline made it available in a different place. National Fuel’s next experiment asks which of those activities belong under the same stock ticker. The furnace at the end of the system will offer a less philosophical test: does the heat arrive?