Enterprise · Hardware · Logistics
Accelevation Bet $50 Million That the AI Boom Needs a Factory Floor
The Ohio manufacturer survived a shutdown-era order collapse, found a wedge in polycarbonate panels and built its way into power, steel and field installation. Its real product is not a door or a cable - it is fewer handoffs on a data-center schedule.