# Oncor Electric Delivery

> Oncor is a Dallas-based regulated electricity transmission and distribution company serving more than 4.1 million homes and businesses across Texas. It operates the poles, wires, substations and meters behind retail electricity service and has announced a $47.5 billion base capital plan for 2026-2030.

- **Founded:** 2001
- **Headquarters:** Dallas, United States
- **Products:** Electric transmission, Electric distribution, Advanced metering, MyOncor and outage tools, New service and interconnection
- **Notable:** Operates more than 145,000 circuit miles of transmission and distribution lines, per August 2026 reporting., First utility to receive PUCT approval for a System Resiliency Plan, in November 2024, according to Oncor., Built, rebuilt or upgraded approximately 3,100 circuit miles in 2025.

## Products & services

- **Electric transmission** — High-voltage lines, substations and interconnection infrastructure moving electricity across Texas.
- **Electric distribution** — Local electricity delivery, maintenance, vegetation management and service restoration for homes and businesses.
- **Advanced metering** — Smart meters record electricity consumption in 15-minute intervals and provide distribution-system information.
- **MyOncor and outage tools** — Outage reporting, status checks, map access and customer alerts.
- **New service and interconnection** — Construction coordination for developers, industrial loads and generation connections, including renewables.
- **Energy efficiency programs** — Incentives delivered through participating providers for eligible residential and commercial energy-saving improvements.

## Achievements

- Operates more than 145,000 circuit miles of transmission and distribution lines, per August 2026 reporting.
- First utility to receive PUCT approval for a System Resiliency Plan, in November 2024, according to Oncor.
- Built, rebuilt or upgraded approximately 3,100 circuit miles in 2025.
- Placed its portion of the 165-mile double-circuit 345 kV Delaware Basin Stage 2 transmission project into service in June 2026.

## Latest updates

- **2026-02** — Announced a $47.5 billion 2026-2030 base capital plan, plus approximately $10 billion of potential incremental opportunities; these are plans, not completed expenditure.
- **2026-03** — Filed a joint 765 kV line application with LCRA TSC for Schleicher to Bell counties.
- **2026-08** — Reported $428 million Q2 net income and $640 million first-half net income; new base rates took effect June 1 and a temporary surcharge August 1.
- **2026-09** — Announced the addition of Toyota trucks after nearly two years of fleet evaluation.
- **2026-10** — On October 20, announced that third-quarter 2026 results would be released November 5; those results were not available at the October 22 research cutoff.

## Links

- Website: https://www.oncor.com
- LinkedIn: https://www.linkedin.com/company/oncor-electric-delivery/
- Twitter/X: https://x.com/oncor
- YouTube: https://www.youtube.com/oncor
- Instagram: https://www.instagram.com/oncordelivers/
- Facebook: https://www.facebook.com/oncor

---

Profile page: https://yespress.io/oncor-electric-delivery
Published by YesPress — https://yespress.io
Last updated: 2026-10-22