# Legend Energy Services

> Legend Energy Services was an Oklahoma City oilfield services contractor founded in 2010. It supplied coiled tubing, pressure pumping, nitrogen and fluid pumping services to U.S. oil and gas operators. Its technical offering combined large-diameter tubing, job simulation and remote monitoring. The company filed for Chapter 7 bankruptcy in October 2021.

- **Founded:** 2010
- **Headquarters:** Oklahoma City, United States
- **Products:** Coiled tubing services, Pressure pumping, Nitrogen services, Fluid pumping, Super String
- **Notable:** Partner case study reports both selected Bakken wells reached total depth despite predicted coiled tubing lockup., NOV publicly described Legend as a standardization customer in its 2018 analyst presentation., Recognized in a January 2019 Texas Parks and Wildlife Commission meeting for support of the Balmorhea pool restoration campaign.

## Products & services

- **Coiled tubing services** — Long-lateral completion and intervention work using large-diameter coiled tubing equipment.
- **Pressure pumping** — Hydraulic fracturing services; expansion financed in 2017.
- **Nitrogen services** — Pumping support for upstream and midstream applications.
- **Fluid pumping** — Pumping support for well completion operations.
- **Super String** — Custom coiled tubing string designed for extended reach.
- **Legend Live** — Proprietary remote monitoring of job channels including depth, speed, weight and pressure.

## Achievements

- Partner case study reports both selected Bakken wells reached total depth despite predicted coiled tubing lockup.
- NOV publicly described Legend as a standardization customer in its 2018 analyst presentation.
- Recognized in a January 2019 Texas Parks and Wildlife Commission meeting for support of the Balmorhea pool restoration campaign.

## Latest updates

- **2025-02** — The Fifth Circuit affirmed dismissal of former Legend employees’ successor-liability claims against asset purchaser Grappler Pressure Pumping on the facts of that case.
- **2021-10** — Filed a voluntary Chapter 7 petition in the Eastern District of Texas on October 26.

## Links

- Website: http://www.legendenergyservices.com
- LinkedIn: https://www.linkedin.com/company/legend-energy-services
- Facebook: https://www.facebook.com/legendenergyservices

---

Profile page: https://yespress.io/legend-energy-services
Published by YesPress — https://yespress.io
Last updated: 2026-10-23
