# Fluor Corporation

> Fluor is a publicly traded engineering, procurement, construction and maintenance company serving industrial owners and governments worldwide. Its three business segments cover energy, infrastructure and manufacturing, and government missions; its recent strategy emphasizes reimbursable contracts and selective project risk.

- **Founded:** 1912
- **Headquarters:** Irving, United States
- **Founders:** John Simon Fluor (Founder)
- **Products:** Engineering and design, Procurement and logistics, Fabrication and modular construction, Construction and construction management, Operations and maintenance support
- **Notable:** JGC-Fluor delivered LNG Canada Phase 1; first cargo left June 30, 2025, and handover was completed in October 2025., Reported US$26.9 billion in backlog at June 30, 2026, 85% reimbursable., Selected with JGC for LNG Canada Phase 2 in September 2026; Fluor announced a US$7.5 billion contract share.

## Products & services

- **Engineering and design** — Conceptual and detailed design across process, mechanical, piping, electrical, control systems, civil, structural and architectural disciplines.
- **Procurement and logistics** — Strategic sourcing, materials management, equipment acquisition, contract management and logistics for capital projects.
- **Fabrication and modular construction** — Integration of off-site fabrication, module transport and site construction to manage complex project delivery.
- **Construction and construction management** — Mobilization, sequencing and management of craft labor and subcontractors through commissioning.
- **Operations and maintenance support** — Facility maintenance and sustaining capital project services.
- **Mission Solutions** — Government services for national security, nuclear work, and emergency response and recovery.
- **Econamine FG Plus** — Licensed solvent-based technology for post-combustion carbon dioxide capture from low-pressure flue gas.

## Achievements

- JGC-Fluor delivered LNG Canada Phase 1; first cargo left June 30, 2025, and handover was completed in October 2025.
- Reported US$26.9 billion in backlog at June 30, 2026, 85% reimbursable.
- Selected with JGC for LNG Canada Phase 2 in September 2026; Fluor announced a US$7.5 billion contract share.
- Balfour Beatty-Fluor celebrated the opening of the US$677 million Oak Hill Parkway in September 2026; final activities were still underway.

## Latest updates

- **2026-09** — JGC-Fluor selected for LNG Canada Phase 2 following final investment decision; expansion targets approximately 28 million tonnes a year of total LNG capacity.
- **2026-09** — Balfour Beatty-Fluor celebrated Oak Hill Parkway opening; final completion anticipated by year-end.
- **2026-08** — Second-quarter revenue was US$4.3 billion, net earnings attributable to Fluor US$114 million and backlog US$26.9 billion. NuScale monetization was completed in April.
- **2026-07** — Signed long-term program management consultancy agreement with Aramco.

## Links

- Website: https://www.fluor.com/
- LinkedIn: https://www.linkedin.com/company/fluor
- Twitter/X: https://twitter.com/FluorCorp
- YouTube: https://www.youtube.com/user/FluorCorporation
- Instagram: https://www.instagram.com/fluorofficial/
- Facebook: https://www.facebook.com/FluorCorp/

---

Profile page: https://yespress.io/fluor-corporation
Published by YesPress — https://yespress.io
Last updated: 2026-10-22
