# Avnos

> Avnos develops Hybrid Direct Air Capture technology that captures atmospheric CO2 while producing clean water. Its factory-built HDAC modules target data centers, geologic carbon storage and synthetic-fuel production, with operating demonstration infrastructure in New Jersey and a larger U.S. project under construction.

- **Founded:** 2020
- **Headquarters:** Los Angeles, United States
- **Founders:** Will Kain (Founder & CEO)
- **Products:** HDAC Data Center Module, HDAC Carbon Storage Module, HDAC eFuels Module
- **Notable:** Bakersfield pilot began operating in 2023 with nominal annual capacities of 30 tons CO2 and 150 tons water., Opened a 20,000-square-foot Technology Development Center in Bridgewater in 2024., Project Brighton entered operations in September 2026, designed for up to 450 tonnes CO2 and approximately 475,000 gallons of water annually.

## Products & services

- **HDAC Data Center Module** — Factory-built platform designed to use low-grade waste heat for cooling support, water production and atmospheric carbon capture. Published campus benefits are modeling estimates.
- **HDAC Carbon Storage Module** — Produces a high-purity CO2 stream for downstream permanent geologic storage; first units are destined for Project Cedar.
- **HDAC eFuels Module** — Supplies atmospheric CO2 and clean water for sustainable aviation fuel, methanol and other synthesis pathways.

## Achievements

- Bakersfield pilot began operating in 2023 with nominal annual capacities of 30 tons CO2 and 150 tons water.
- Opened a 20,000-square-foot Technology Development Center in Bridgewater in 2024.
- Project Brighton entered operations in September 2026, designed for up to 450 tonnes CO2 and approximately 475,000 gallons of water annually.
- Introduced its first standardized factory-built HDAC product family on September 17, 2026.

## Latest updates

- **2026-09** — September 17: launched factory-built HDAC modules for data centers, carbon storage and eFuels.
- **2026-09** — September 1: announced Project Brighton had entered operations in Bridgewater.
- **2026-07** — Reported Scale IV as its primary engineering platform after completion of Project Alpine, with 1,000+ operating hours and controlled temperature/humidity testing.
- **2025-11** — Announced Cedar financing and a target of commissioning by the end of 2026; no completed commissioning established as of October 15, 2026.

## Links

- Website: https://avnos.com/
- LinkedIn: https://www.linkedin.com/company/avnos-inc/

---

Profile page: https://yespress.io/avnos
Published by YesPress — https://yespress.io
Last updated: 2026-10-15
