# Agile Space Industries

> Agile Space Industries designs, manufactures, and tests chemical propulsion hardware for spacecraft. Its integrated design, metal additive manufacturing, and hot-fire testing operations supply thrusters, tanks, custom development, and test services to commercial, civil, and national security programs.

- **Founded:** 2019
- **Headquarters:** Durango, United States
- **Founders:** Daudi Barnes (Co-founder; founder of predecessor AMPT), Jeffrey Max (Co-founder), Julian Miller (Co-founder)
- **Products:** M4, DS110, HP250, DS250 for Nyx, VoidRunner / DS3000
- **Notable:** More than 8,000 hot-fire tests reported across its test infrastructure., Experimental AX19 preburner designed through delivery in 19 weeks., Nyx DS250 first iteration designed, printed, assembled, and hot-fire tested in ten weeks.

## Products & services

- **M4** — 4 N hydrazine monopropellant thruster for small-spacecraft attitude and position control.
- **DS110** — 110 N MMH/MON3 bipropellant thruster for attitude control and delta-V maneuvers.
- **HP250** — 250 N N2H4/MON3 bipropellant axial thruster listed in the current catalog.
- **DS250 for Nyx** — 250 N MMH/MON3 bipropellant thruster developed for encapsulated thermal operation in Nyx; first iteration demonstrated in ten weeks.
- **VoidRunner / DS3000** — Large spacecraft main-thrust engine; ispace replaced its planned use after efficiency-demonstration delays. Listed in Agile’s current catalog.
- **Zero Slosh Piston Tanks** — Propellant storage designed to suppress slosh; manufacturer specifies greater than 99.75% expulsion efficiency.
- **Hot-fire testing services** — Ambient and simulated-altitude chemical propulsion testing using Sunshine and Animas stands in Durango.
- **AX19 preburner** — Experimental hydrazine-rich preburner designed and delivered for Sierra Space in 19 weeks.

## Achievements

- More than 8,000 hot-fire tests reported across its test infrastructure.
- Experimental AX19 preburner designed through delivery in 19 weeks.
- Nyx DS250 first iteration designed, printed, assembled, and hot-fire tested in ten weeks.
- A110 thruster qualification announced in 2023.
- Durango expansion brought headquarters to approximately 40,000 square feet in 2026.

## Latest updates

- **2026-01** — Broke ground on the initial USD 20 million phase of the Tulsa Space Test Center.
- **2026-02** — Announced an oversubscribed USD 17 million Series A.
- **2026-03** — ispace announced replacement of VoidRunner after delays demonstrating required efficiency, alongside a lander redesign and proposed U.S. mission shift to 2030 pending NASA approval.
- **2026-09** — Reported completed Durango expansion and 167 employees companywide.
- **2026-10** — Jonathan Baliff joined the board; Theo Squires added as Director of Strategy & Corporate Development; company described STRATFI selection supporting complete subsystems.

## Links

- Website: https://agile.space
- LinkedIn: https://www.linkedin.com/company/agile-space-industries
- Twitter/X: https://x.com/agile_space
- Instagram: https://www.instagram.com/agile.space/

---

Profile page: https://yespress.io/agile-space-industries
Published by YesPress — https://yespress.io
Last updated: 2026-10-06